Barage Complect Ltd. has been performing construction and installation works on the grounds of Zlatna Panega AD since January 2002. As at the present moment, Barage Complect Ltd. has entered into contracts for performance of construction and installation works on the following sites: “Coal grinding plant”, “Reconstruction of a slag dryer” and “Making of exterior reinforced concrete walls to the coal mill”.
The coal mill on the grounds of Zlatna Panega AD has a flammability rating of B2a, due to which all construction and installation works on the site are being performed under the construction supervision of TUV Rheinland Bulgarien GmbH. The construction and installation works on the site shall include:
The following technological equipment has been installed on the site:
With respect to the project “Reconstruction of slag dryer” Barage Complect Ltd. were contracted to perform the following types of construction and installation works:
The following technological equipment has been installed on the site:
The technical equipment is supplied by PSP Engineering.