Aerated concrete plant – Town of Dobrich

The site Aerated Concrete Plant – Town of Dobrich was built as an investment of the company Ksela Bulgaria OOD. The plant is situated on a site of 100,000 m2, the main production body having an area of 14,000 m2. It was built over 11 months.

The construction and installation works included: